Publications of Lucio Bianco

This page shows all publications that appeared in the IASI annual research reports. Authors currently affiliated with the Institute are always listed with the full name.

You can browse through them using either the links of the following line or those associated with author names.

Show all publications of the year  ALL, with author Bianco L., in the category ALL (or show them all):   (Items found: 96)


2007 | 2006 | 1999 | 1998 | 1997 | 1996 | 1995 | 1994 | 1993 | 1992 | 1991 | 1990 | 1989 | 1988 | 1987 | 1986 | 1985 | 1982 | 1981 | 1980 | 1977

2007  [top]
  • Bianco L., Caramia M.: A New Approach to the Project Scheduling Problem with Generalized Precedence Relations, DII, Università di Roma Tor Vergata, 0, 2007
  • Bianco L., Caramia M.: A New Formulation of the Resource Unconestrained Project Scheduling Problem with Generalized Procedence Relations to Minimize the Completion Time, DII, Università di Roma Tor Vergata, 0, 2007
  • Bianco L., Caramia M.: A New Lower Bound for the Resource Constrainted Project Scheduling Problem with Generalized Precedence Relationships, DII, Università di Roma Tor Vergata, 0, 2007
  • Bianco L., Caramia M., Giordani S.: A Bi-level Network Flow Model for Planning Hazmat Shipments, in the Proceedings of Tristan VI, 2007
  • Bianco L., Cerulli R., Gentili M.: New Resolution Approach for the Sensor Location Problem , in the Proceedings of Tristan VI, 2007

2006  [top]

1999  [top]

1998  [top]
  • Bianco L., Caramia M., Dell'Olmo P.: Solving a preemptive project scheduling problem with coloring techniques, in: Project Scheduling; Recent Models, Algorithms and Applications, Weglarz J. ed., Operations Research and Management Science, 14, Kluwer, 1998
  • Bianco L., Dell'Olmo P., Speranza M.G.: Heuristics for Multimode Scheduling Problems with Dedicated Resources, European Journal of Operational Research 107, 260-271, 1998

1997  [top]
  • Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Preemptive Multiprocessor Tasks Scheduling with Release Times and Time Windows, Annals of Operations Research 70, 43-55, 1997
  • Bianco L., Campisi D.: Sistemi convenzionali, intermodalità e sviluppo sostenibile: una valutazione economica delle possibilità di riconversione del trasporto merci in Italia, in the Proceedings of Atti del III Convegno Nazionale del Progetto Finalizzato Trasporti 2, Cascetta E. ed., 1997
  • Bianco L., Confessore G., Reverberi P.: A Combinatorial Optimization Approach to Locate Traffic Counting Points in a Transport Network, in: Operations Research Proceedings 1996, Zimmermann U., others eds., Springer-Verlag, 283-288, 1997
  • Bianco L., Confessore G., Reverberi P.: A combinatorial optimization approach to locate traffic counting points in a transport network, IASI-CNR, R. 449, 01/1997
  • Bianco L., Dell'Olmo P., Giordani S.: An Optimal Algorithm to Find the Jump Number of Partially Ordered Sets, Computational Optimization and Applications 8, 197-210, 1997
  • Bianco L., Dell'Olmo P., Giordani S.: Models and Algorithms for Real-Time Control of Aircraft Landing, in: Operations Research Proceedings 1996, Zimmermann U., others eds., Springer-Verlag, 289-294, 1997
  • Bianco L., Dell'Olmo P., Giordani S.: Scheduling Models and Algorithms for TMA Traffic Management, in: Modelling and Simulation in Air Traffic Management, Bianco L., others eds., Transportation Analysis, Springer-Verlag, 139-167, 1997
  • Bianco L., Dell'Olmo P., Odoni A.R. eds.: Modelling and Simulation in Air Traffic Management, Transportation Analysis, Springer-Verlag, 1997
  • Mingozzi A., Bianco L., Ricciardelli S.: Dynamic programming strategies for the traveling salesman problem with time window and precedence constraints, Operations Research 45, 365-377, 1997

1996  [top]
  • Bianco L., Confessore G., Reverberi P.: A combinatoirial optimization approach to locate traffic counting points in a transport network, in the Proceedings of SOR '96, Germany, 1996
  • Bianco L., Toth P. eds.: Advances Methods in Transportation Analysis, Springer-Verlag, 1996

1995  [top]
  • Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling multiprocessor tasks on dynamic configuration of dedicated processors, Annals of Operations Research 58, 493-518, 1995
  • Bianco L., Campisi D., Gastaldi M.: Which regions really benefits from rail-truck substitution? Replies and empirical Evidence from the Italian case, Papers in Regional Science, the Journal of the Regional Science Association International, 41-62, 1995
  • Bianco L., Dell'Olmo P., Giordani S.: The traveling salesman problem with precedence constraints and binary costs, in the Proceedings of XVII IFIP Conference on System Modeling and Optimization, Prag, Lecture Notes in Control and Information Sciences, Springer-Verlag, 543-550, 1995
  • Bianco L., Dell'Olmo P., Giordani S.: One machine scheduling problem with ready times and sequence dependent processing times: preliminary results, IASI-CNR, R. 408, 05/1995
  • Bianco L., Dell'Olmo P., Speranza M.G.: Scheduling independent tasks with multiple modes, Discrete Applied Mathematics 62, 35-50, 1995
  • Bianco L., Dell'Olmo P., Speranza M.G.: Scheduling Independent Tasks with Multiple Shared Resources, in: Optimization in Industry 3, John Wiley and Sons, 35-53, 1995
  • Bianco L., Maniezzo V., Mingozzi A., Ricciardelli S.: An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation, IASI-CNR, R. 405, 02/1995
  • Bianco L., Mingozzi A., Ricciardelli S.: Combining vehicle trips, in the Proceedings of Computer Aided Transit Scheduling, Daduna I.R., Branco I., Pinto Paixao J.M. eds., Lecture Notes in Economics and Mathematical Systems, Springer-Verlag, 1995

1994  [top]
  • Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling preemptive multiprocessor tasks on dedicated processors, Performance Evaluation 20, 361-371, 1994
  • Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling UET multiprocessor tasks, Foundation of Computing and Decision Sciences 19, 273-283, 1994
  • Bianco L., Dell'Olmo P.: The Minimization of resources costs in scheduling independent tasks with fixed completion time, in the Proceedings of IFIP Conference on System Modelling and Optimization, Lecture Notes in Control and Information Sciences, Springer-Verlag, 785-794, 1994
  • Bianco L., Dell'Olmo P., Ezchkova I.: Application of contextual technology for supporting decision making in transportation, in the Proceedings of VII IFAC/IFORS Symposium on Transportation Systems: Theory and Applications of Advanced Technology, Tianjin, 363-368, 1994
  • Bianco L., Dell'Olmo P., Giordani S.: Exact and Heuristic Algorithms for the jump number problem, in the Proceedings of International Conference on Operations Research, Berlin, Derigs U. ed., Operations Research Proceedings, Springer-Verlag, 145-150, 1994
  • Bianco L., Dell'Olmo P., Giordani S.: Exact and heuristic algorithms for the jump number problem, IASI-CNR, R. 376, 02/1994
  • Bianco L., Dell'Olmo P., Giordani S.: An exact algorithm for the minimization of additional resources cost in scheduling tasks with fixed completion time, IASI-CNR, R. 383, 07/1994
  • Bianco L., Dell'Olmo P., Speranza M.G.: Nonpreemptive scheduling of independent tasks with prespecified processors allocation, Naval Research Logistics Quarterly 41, 1994
  • Bianco L., Mingozzi A., Ricciardelli S.: A set partitioning approach to the multiple depot vehicle scheduling problem, Optimization Methods & Software 3, 163-194, 1994
  • Bianco L., Mingozzi A., Ricciardelli S., Spadoni M.: Exact and heuristic procedures for the traveling salesman problem with precedence constraints, based on dynamic programming, Information Systems and Operational Research 32 (1), 19-32, 1994

1993  [top]
  • Bianco L., Bielli M.: System aspects and optimization models in ATC planning, in: Large Scale Computation and Information Processing in Air Traffic Control, Bianco L., Odoni A.R. eds., Springer-Verlag, 47-99, 1993
  • Bianco L., Bielli M., Speranza M.G. eds.: Summer Institute in Urban Traffic Management, European Journal of Operational Research, 71, North Holland, 1993
  • Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Preemptive scheduling of multiprocessor tasks on dedicated processors systems subject to minimal lateness, Information Processing Letters 46, 109-113, 1993
  • Bianco L., Mingozzi A., Navoni M., Ricciardelli S.: An exact algorithm for combining truck trips, IASI-CNR, R. 354, 02/1993
  • Bianco L., Mingozzi A., Ricciardelli S.: The traveling salesman problem with cumulative costs, Networks 23, 81-91, 1993
  • Bianco L., Mingozzi A., Ricciardelli S.: Dynamic programming strategies and reduction techniques for the traveling salesman problem with time window and precedence constraints, IASI-CNR, R. 353, 01/1993
  • Bianco L., Odoni A.R. eds.: Large Scale Computation and Information Processing in Air Traffic Control, Springer-Verlag, 1993

1992  [top]

1991  [top]
  • Bianco L., Dell'Olmo P., Speranza M.G.: Nonpreemptive scheduling of independent tasks with dedicated resources., IASI-CNR, R. 320, 06/1991
  • Bianco L., di Maio F.: Perspectives of high speed rail transport in short-medium period, Transportation Research 25 (3), 1991

1990  [top]

1989  [top]

1988  [top]

1987  [top]

1986  [top]
  • Bianco L.: Strategic control to improve efficiency of air traffic management, in: AGARD CP-410, 1986
  • Bianco L.: The role of quantitative methods in urban transportation planning., IASI-CNR, R. 165, 09/1986
  • Bianco L., D'Anselmi P.: Strenghtening the management of public research policy in Italy, Research Policy 15 (3), 1986
  • Bianco L., La Bella A. eds.: Automotive Micro-Electronics, North-Holland, 1986
  • Bianco L., La Bella A.: Social preference and political issues in transportation planning: an analytical approach., IASI-CNR, R. 168, 10/1986

1985  [top]

1982  [top]
  • Bianco L., Ricciardelli S.: On scheduling with ready times to minimize total weighted completion time, in: Control Science and Technology for the progress of Society, Pergamon Press, 1982
  • Bianco L., Ricciardelli S.: Scheduling of a single machine to minimize total weighted completion time subject to release dates, Naval Research Logistics Quarterly 29, 1982

1981  [top]
  • Andreussi A., Bianco L., Ricciardelli S.: A simulation Model for aircraft sequencing in the near terminal area, European Journal of Operational Research 8, 1981
  • Bianco L., Ricciardelli S.: Automated aircraft management in the near terminal area, in: Scientific Management on Transport Systems, North-Holland, 1981
  • Bianco L., Ricciardelli S.: Scheduling of a single machine to minimize total weighted completion time subject to release dates., IASI-CNR, R. 12, 06/1981

1980  [top]
  • Bianco L., Bielli M., Cini M., Grippo L., Ricciardelli S.: Management Models for Improving Air Traffic Control Systems Performances, in: Transport Research for Social and Economic Progress, Vol.~2, 1093-1106, 1980
  • Bianco L., Bielli M., Cini M., Grippo L., Ricciardelli S.: New Approaches to Air Traffic Control and Management, in: Transport Research for Social and Economic Progress, Vol.~4, 2373-2384, 1980
  • Bianco L., Cini M., Grippo L.: A Strategic Approach to Air Traffic Control, in: Optimization Techniques, Irachi K., Malanowski K., Walukiewicz S. eds., Springer-Verlag Berlin, 345-355, 1980
  • Bianco L., Ricciardelli S.: Minimizing mean weighted completion time in one machine scheduling problem, in: Methods of Operations Research, 1980

1977  [top]
  • Paola Bertolazzi, Bianco L., Ricciardelli S.: An approach to the solution of the location problem in urban emergency services, in the Proceedings of IFAC Workshop on Application to Complex Analysis, Bielsko Biala, Giugno 1977, 33-38, 1977
  • Paola Bertolazzi, Bianco L., Ricciardelli S.: A method for determining the optimal districting in urban emergency services, Computers & Operations Research 4, 1-12, 1977
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -