This page shows all publications that appeared in the IASI annual research reports.
Authors currently affiliated with the Institute are always listed with the full name.
You can browse through them using either the links of the following line or those associated with
author names.
Show all publications of the year
ALL, with author Dell'Olmo P., in the category ALL
(or show them all): (Items found: 62)
2006 | 2005 | 2003 | 2002 | 2001 | 2000 | 1999 | 1998 | 1997 | 1995 | 1994 | 1993 | 1992 | 1991 | 1989
2006 [top] 2005 [top]
- Confessore G., Dell'Olmo P., Gentili M.: Experimental evaluation of approximation and heuristic algorithms for the dominating paths problem, Computers & Operations Research 32 (9), 2383-2405, 2005
- Dell'Olmo P., Gentili M., Scozzari A.: On finding dissimilar Pareto-optimal paths, European Journal of Operational Research 162 (1), 70-82, 2005
- Dell'Olmo P., Hansen P., Pallottino S., Storchi G.: On uniform $k$-partition problems, Discrete Applied Mathematics 150 (1-3), 121-139, 2005
2003 [top]
- Caramia M., Dell'Olmo P.: Assessing the Resource Usage in Scheduling with Incompatibilities, Or Spectrum 25 (4), 521-547, 2003
- Dell'Olmo P., Gentili M.: Scheduling Problems with Machine saturation Property, Mathematical Methods of Operations Research, accepted for pubblication, 2003
2002 [top]
- Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling multiprocessor tasks on two parallel processors, Rairo-Recherche Operationnelle-Operations Research, 37-57, 2002
- Caramia M., Dell'Olmo P.: Constraint Propagation in Graph Coloring, Journal of Heuristics 8, 83-107, 2002
- Confessore G., Dell'Olmo P., Giordani S.: An Approximation Result for the Interval Coloring Problem on Claw-free Chordal Graphs, Discrete Applied Mathematics, 73-90, 2002
2001 [top]
- Caramia M., Dell'Olmo P.: Iterative Coloring Extension of a Maximum Clique, Naval Research Logistics 48, 1-33, 2001
- Caramia M., Dell'Olmo P.: A Lower Bound on the Chromatic Number of Mycielski Graphs, Discrete Mathematics 235, 79-86, 2001
- Confessore G., Dell'Olmo P., Giordani S.: An Approximation Result for a Periodic Allocation Problem, Discrete Applied Mathematics 112, 53-72, 2001
2000 [top]
- Caramia M., Dell'Olmo P., Italiano G.F.: New Algorithms for Examination Timetabling, in the Proceedings of Proceeding of the 4-th Workshop on Algorithm Engineering, Springer-Verlag, 2000
- Confessore G., Dell'Olmo P., Giordani S.: A Linear Time Approximation Algorithm for Interval Coloring on Proper Interval Graphs, International Journal of Mathematical Algorithms 2, 133-147, 2000
- Confessore G., Dell'Olmo P., Giordani S.: Orienting Dart-free Clique-Helly Graphs, in the Proceedings of Operations Research Proceedings 1999, Springer-Verlag, 52-57, 2000
- Drozdowski M., Dell'Olmo P.: Scheduling Multiprocessor Tasks for Mean Flow Time Criterion, Computers & Operations Research 27, 571-585, 2000
1999 [top]
- Andreatta G., Brunetta L., Dell'Olmo P.: Valutazione della capacità di un terminal aereoportuale, in: Scienza delle decisioni e trasporti, Pallottino S., Sciomachen A. eds., Franco Angeli, 244-261, 1999
- Bianco L., Dell'Olmo P., Giordani S.: Minimizing Total Completion Time Subject to Release Dates and Sequence-Dependent Processing Times, Annals of Operations Research 86, 393-415, 1999
- Bianco L., Dell'Olmo P., Giordani S.: Flow Shop No-Wait Scheduling with Sequence Dependent Setup Times and Release Dates, Information Systems and Operational Research 37, 3-19, 1999
- Bianco L., Dell'Olmo P., Giordani S., Speranza M.G.: Minimizing Makespan in a Multimode Multiprocessor Shop Scheduling Problem, Naval Research Logistics 46, 893-911, 1999
- Bianco L., Dell'Olmo P., Ricciardelli S.: Il controllo del traffico aereo, in: Scienza delle decisioni e trasporti, Pallottino S., Sciomachen A. eds., Franco Angeli, 284-305, 1999
- Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling of Client-Server Applications, International Transactions in Operational Research 6, 345-363, 1999
- Caramia M., Dell'Olmo P.: A Fast and Simple Local Search for Graph Coloring, Lecture Notes in Computer Science, 1668, Springer-Verlag, 316-329, 1999
- Confessore G., Dell'Olmo P., Giordani S.: A Linear Time Approximation Algorithm for a Storage Allocation Problem, in the Proceedings of IFIP Systems Modelling and Optimization, 1997, Detroit, Addison Wesley, Longman, 126-131, 1999
- Confessore G., Dell'Olmo P., Giordani S.: Vertex Partitioning of Crown-free Interval Graphs, Lecture Notes in Computer Science, 1665, Springer-Verlag, 391-401, 1999
- Dell'Olmo P., Speranza M.G.: Approximation Algorithms for Partitioning Small Items in Unequal Bins to Minimize the Total Size, Discrete Applied Mathematics 34, 181-191, 1999
1998 [top]
- Bianco L., Caramia M., Dell'Olmo P.: Solving a preemptive project scheduling problem with coloring techniques, in: Project Scheduling; Recent Models, Algorithms and Applications, Weglarz J. ed., Operations Research and Management Science, 14, Kluwer, 1998
- Bianco L., Dell'Olmo P., Speranza M.G.: Heuristics for Multimode Scheduling Problems with Dedicated Resources, European Journal of Operational Research 107, 260-271, 1998
- Confessore G., Dell'Olmo P., Giordani S.: An approximation result for a bandwidth allocation problem, in the Proceedings of Operations Research Proceedings '97, Kischka P., others eds., Springer-Verlag, 126-131, 1998
- Dell'Olmo P., Kellerer H., Speranza M.G., Tuza Zs.: Partitioning Items in a Fixed Number of Bins to Minimize Total Size, Information Processing Letters 65, 229-233, 1998
- Dror M., Kubiak W., Dell'Olmo P.: Strong-Weak Chain Constrained Scheduling, Ricerca Operativa 27, 36-49, 1998
1997 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Preemptive Multiprocessor Tasks Scheduling with Release Times and Time Windows, Annals of Operations Research 70, 43-55, 1997
- Bianco L., Dell'Olmo P., Giordani S.: An Optimal Algorithm to Find the Jump Number of Partially Ordered Sets, Computational Optimization and Applications 8, 197-210, 1997
- Bianco L., Dell'Olmo P., Giordani S.: Models and Algorithms for Real-Time Control of Aircraft Landing, in: Operations Research Proceedings 1996, Zimmermann U., others eds., Springer-Verlag, 289-294, 1997
- Bianco L., Dell'Olmo P., Giordani S.: Scheduling Models and Algorithms for TMA Traffic Management, in: Modelling and Simulation in Air Traffic Management, Bianco L., others eds., Transportation Analysis, Springer-Verlag, 139-167, 1997
- Bianco L., Dell'Olmo P., Odoni A.R. eds.: Modelling and Simulation in Air Traffic Management, Transportation Analysis, Springer-Verlag, 1997
- Confessore G., Dell'Olmo P., Giordani S.: An approximation algorithm for proper dynamic storage allocation, IASI-CNR, R. 448, 01/1997
- Dell'Olmo P., Giordani S., Speranza M.G.: An approximation result for a duo-processor task scheduling problem, Information Processing Letters 61, 195-200, 1997
- Dell'Olmo P., Giordani S., Speranza M.G.: Graph Models for a Duo-Processor Task Scheduling Problem, in: Operations Research Proceedings 1996, Zimmermann U., others eds., Springer-Verlag, 186-191, 1997
- Dror M., Kubiak W., Dell'Olmo P.: Scheduling Chains to Minimize Mean Flow Time, Information Processing Letters 61, 297-301, 1997
1995 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling multiprocessor tasks on dynamic configuration of dedicated processors, Annals of Operations Research 58, 493-518, 1995
- Bianco L., Dell'Olmo P., Giordani S.: The traveling salesman problem with precedence constraints and binary costs, in the Proceedings of XVII IFIP Conference on System Modeling and Optimization, Prag, Lecture Notes in Control and Information Sciences, Springer-Verlag, 543-550, 1995
- Bianco L., Dell'Olmo P., Giordani S.: One machine scheduling problem with ready times and sequence dependent processing times: preliminary results, IASI-CNR, R. 408, 05/1995
- Bianco L., Dell'Olmo P., Speranza M.G.: Scheduling independent tasks with multiple modes, Discrete Applied Mathematics 62, 35-50, 1995
- Bianco L., Dell'Olmo P., Speranza M.G.: Scheduling Independent Tasks with Multiple Shared Resources, in: Optimization in Industry 3, John Wiley and Sons, 35-53, 1995
1994 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling preemptive multiprocessor tasks on dedicated processors, Performance Evaluation 20, 361-371, 1994
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling UET multiprocessor tasks, Foundation of Computing and Decision Sciences 19, 273-283, 1994
- Bianco L., Dell'Olmo P.: The Minimization of resources costs in scheduling independent tasks with fixed completion time, in the Proceedings of IFIP Conference on System Modelling and Optimization, Lecture Notes in Control and Information Sciences, Springer-Verlag, 785-794, 1994
- Bianco L., Dell'Olmo P., Ezchkova I.: Application of contextual technology for supporting decision making in transportation, in the Proceedings of VII IFAC/IFORS Symposium on Transportation Systems: Theory and Applications of Advanced Technology, Tianjin, 363-368, 1994
- Bianco L., Dell'Olmo P., Giordani S.: Exact and Heuristic Algorithms for the jump number problem, in the Proceedings of International Conference on Operations Research, Berlin, Derigs U. ed., Operations Research Proceedings, Springer-Verlag, 145-150, 1994
- Bianco L., Dell'Olmo P., Giordani S.: Exact and heuristic algorithms for the jump number problem, IASI-CNR, R. 376, 02/1994
- Bianco L., Dell'Olmo P., Giordani S.: An exact algorithm for the minimization of additional resources cost in scheduling tasks with fixed completion time, IASI-CNR, R. 383, 07/1994
- Bianco L., Dell'Olmo P., Giordani S.: The traveling salesman problem with precedence contraints and binary costs, IASI-CNR, R. 397, 12/1994
- Bianco L., Dell'Olmo P., Speranza M.G.: Nonpreemptive scheduling of independent tasks with prespecified processors allocation, Naval Research Logistics Quarterly 41, 1994
1993 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Preemptive scheduling of multiprocessor tasks on dedicated processors systems subject to minimal lateness, Information Processing Letters 46, 109-113, 1993
- Bielli M., Dell'Olmo P.: The flexibility of scheduling tools for order production problems, Computer Integrated Manufacturing Systems 6 (1), 64-70, 1993
- Dell'Olmo P., Speranza M.G., Tuza Zs.: Easy and hard cases of a scheduling problem on three dedicated processors, IASI-CNR, R. 359, 06/1993
1992 [top]
- Bianco L., Dell'Olmo P., Speranza M.G.: A decomposition approach to a scheduling problem with multiple modes, Lecture Notes in Control and Information Sciences, 1992
- Bianco L., Dell'Olmo P., Speranza M.G.: Scheduling independent tasks with multiple modes., IASI-CNR, R. 340, 09/1992
- Blazewicz J., Dell'Olmo P., Drozdowski M., Speranza M.G.: Scheduling Multiprocessors Tasks on Three Dedicated Processors, Information Processing Letters 41, 275-280, 1992
1991 [top] 1989 [top]
- Cini M., Dell'Olmo P.: Algorithms for networks of disjunctive temporal constraints., IASI-CNR, R. 278, 12/1989
|