This page shows all publications that appeared in the IASI annual research reports.
Authors currently affiliated with the Institute are always listed with the full name.
You can browse through them using either the links of the following line or those associated with
author names.
Show all publications of the year
ALL, with author Bianco L., in the category Journal Articles
(or show them all): (Items found: 31)
2006 | 1999 | 1998 | 1997 | 1995 | 1994 | 1993 | 1992 | 1991 | 1990 | 1989 | 1988 | 1986 | 1982 | 1981 | 1977
2006 [top]
- Bianco L., Confessore G., Gentili M.: Combinatorial aspect of the sensor location problem, Annals of Operations Research 144 (1), 201-234, 2006
- Bianco L., Dell'Olmo P., Giordani S.: Scheduling models for air traffic control in terminal areas, Journal of Scheduling 9, 223-253, 2006
1999 [top]
- Bianco L., Dell'Olmo P., Giordani S.: Minimizing Total Completion Time Subject to Release Dates and Sequence-Dependent Processing Times, Annals of Operations Research 86, 393-415, 1999
- Bianco L., Dell'Olmo P., Giordani S.: Flow Shop No-Wait Scheduling with Sequence Dependent Setup Times and Release Dates, Information Systems and Operational Research 37, 3-19, 1999
- Bianco L., Dell'Olmo P., Giordani S., Speranza M.G.: Minimizing Makespan in a Multimode Multiprocessor Shop Scheduling Problem, Naval Research Logistics 46, 893-911, 1999
1998 [top]
- Bianco L., Dell'Olmo P., Speranza M.G.: Heuristics for Multimode Scheduling Problems with Dedicated Resources, European Journal of Operational Research 107, 260-271, 1998
1997 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Preemptive Multiprocessor Tasks Scheduling with Release Times and Time Windows, Annals of Operations Research 70, 43-55, 1997
- Bianco L., Dell'Olmo P., Giordani S.: An Optimal Algorithm to Find the Jump Number of Partially Ordered Sets, Computational Optimization and Applications 8, 197-210, 1997
- Mingozzi A., Bianco L., Ricciardelli S.: Dynamic programming strategies for the traveling salesman problem with time window and precedence constraints, Operations Research 45, 365-377, 1997
1995 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling multiprocessor tasks on dynamic configuration of dedicated processors, Annals of Operations Research 58, 493-518, 1995
- Bianco L., Campisi D., Gastaldi M.: Which regions really benefits from rail-truck substitution? Replies and empirical Evidence from the Italian case, Papers in Regional Science, the Journal of the Regional Science Association International, 41-62, 1995
- Bianco L., Dell'Olmo P., Speranza M.G.: Scheduling independent tasks with multiple modes, Discrete Applied Mathematics 62, 35-50, 1995
1994 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling preemptive multiprocessor tasks on dedicated processors, Performance Evaluation 20, 361-371, 1994
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Scheduling UET multiprocessor tasks, Foundation of Computing and Decision Sciences 19, 273-283, 1994
- Bianco L., Dell'Olmo P., Speranza M.G.: Nonpreemptive scheduling of independent tasks with prespecified processors allocation, Naval Research Logistics Quarterly 41, 1994
- Bianco L., Mingozzi A., Ricciardelli S.: A set partitioning approach to the multiple depot vehicle scheduling problem, Optimization Methods & Software 3, 163-194, 1994
- Bianco L., Mingozzi A., Ricciardelli S., Spadoni M.: Exact and heuristic procedures for the traveling salesman problem with precedence constraints, based on dynamic programming, Information Systems and Operational Research 32 (1), 19-32, 1994
1993 [top]
- Bianco L., Blazewicz J., Dell'Olmo P., Drozdowski M.: Preemptive scheduling of multiprocessor tasks on dedicated processors systems subject to minimal lateness, Information Processing Letters 46, 109-113, 1993
- Bianco L., Mingozzi A., Ricciardelli S.: The traveling salesman problem with cumulative costs, Networks 23, 81-91, 1993
1992 [top]
- Bianco L., Bielli M.: Air traffic management: Optimization models and algorithms, Journal of Advanced Transportation 6 (2), 131-167, 1992
- Bianco L., Bielli M., Mingozzi A., Ricciardelli S., Spadoni M.: A heuristic procedure for the crew rostering problem, European Journal of Operational Research 56 (2), 272-283, 1992
- Bianco L., Bielli M., Mingozzi A., Ricciardelli S., Spadoni M.: A heuristic procedure for the crew rostering problem, European Journal of Operational Research 58, 272-283, 1992
1991 [top]
- Bianco L., di Maio F.: Perspectives of high speed rail transport in short-medium period, Transportation Research 25 (3), 1991
1990 [top]
- Bianco L.: Multilevel Approach to the ATC problem: On-line strategic control of flights, International Journal of Systems Science 21, 1515-1527, 1990
- Bianco L., La Bella A.: Social preference and political issues in transportation planning: an analytical approach, Systems Analysis Modelling Simulation 7 (2), 1990
1989 [top]
- Bianco L.: The role of quantitative methods in urban transportation planning, Systems Analysis Modelling Simulation 6 (1), 1989
1988 [top] 1986 [top]
- Bianco L., D'Anselmi P.: Strenghtening the management of public research policy in Italy, Research Policy 15 (3), 1986
1982 [top]
- Bianco L., Ricciardelli S.: Scheduling of a single machine to minimize total weighted completion time subject to release dates, Naval Research Logistics Quarterly 29, 1982
1981 [top] 1977 [top]
|